Church of Scientology, East Grinstead - September 2016
Reduced surface levels of existing estate roads by cold milling. Resurfaced by machine with a dense bituminous surface course.
Fernden Construction Ltd
Training Ground, Gatwick Airport (Landside), Crawley - June 2017
Construction of reinforced concrete bases. Bund wall foundations and temporary footways.
1st Choice Facilities Services Ltd
Cedars Multi Storey Car Park, Uxbridge - April 2016
On level 4 of the car park we carried out repairs to existing mastic asphalt surface and overlaid with approximately 10mm thickness of Polymer modified slurry seal and reinstated markings in thermoplastic to areas required.
Wandsworth Borough Council
Wandsworth Cemetery, London Borough of Wandsworth - July 2016
Constructed new footways and paths, including excavation and disposal of sub bases, kerb works and surfacing.
Universal Sealants (UK) Ltd
County Mall Car Park, Crawley - October 2016
Removal of existing ramps with mastic asphalt. Renewal of waterproof membranes and applied new mastic asphalt. Surfacing to IKO standards and guarantees.
Various Companies
Utilities – Various Locations
Carry out permanent reinstatement works to public footways and carriageways as per HAUC specifications for various different Utility Companies we are contracted to.
This website uses cookies. By continuing to browse the site, you are agreeing to our use of cookies. Read our Privacy Policy here.